Quzhou Futura Kitchen Equipment Co., Ltd. is a production of products for the kitchen appliances, large-scale manufacturing enterprises, the company moved to Quzhou 96 economic development zones, because at that time the technology, resources, in limited, in equipment The original layout and planning workshop above a certain issue, leading to its production of the high cost of logistics, said the company would not change the top of the original planning of facilities and equipment in principle, the logistics of the production cost lower. To help companies find and solve the problem, the paper use of facilities planning methods, the most mainstream of the SLP to Futura's soot-production workshop for the analysis of planning, its main content is a more optimal proposal.
First of all, this paper analyzed the fumes from the aircraft production process and material flow, and on this basis, its logistics analysis to determine the original layout of the workshop reasonable; Secondly, the logistics analysis on the basis of the study and use of SLP And propose an optimized package of proposals.
KEYWORDS: Facilities Planning , SLP , Analysis of logistic