Abstract:The program is the State Building, Wenzhou Hung Kuo Building Construction, the project is 17 layer frame structure with a total construction area of 37947.59m2, prepared for the project construction organization design Familiar with the drawings in the design process to understand the project profiles to carry out construction area, engineering calculation of the amount determined to put the machinery and equipment, artificial number of adds more after the scheduled construction schedule; Determine the appropriate choice of site electricity and water pipelines and transmission lines, according to the site environment, the deployment of the construction plan, and strive to a reasonable arrangement to minimize the material of the second transport; Comparison of economic and technical performance of the construction program, select the new technology, new technology, to choose the best program The preparation of the construction site organization and management, construction quality assurance system, safety and civilized construction management measures.; Using reasonable construction plan, the progress of science program, the successful completion based lay a good foundation.
Keywords: Frame Structure Construction Construction Organization Design