Abstract
This project is the Yiwu second oil pump factory comprehensive building, this project is 7 portal frame constructions, the total floor space is 3826.49 square meter, in view of this project establishment construction organization plan. First, familiar blueprint, understanding project survey, decides upon the mechanical device which firmly invests, artificial quantity, carries on the construction deployment; second pressing "Zhejiang Province Architectural engineering Budget quota" again (2003 editions) carries on the floor space, the resilience computation, resilience computation, obtains the mechanical stage class, the artificial man-day of consumption, the arrangement time schedule schedule of construction, definite time; the third step, according to field condition, deployment construction plan, makes every effort to arrange reasonably, reduces the material as far as possible two transportation; chooses the special plan of construction, compared with plan of construction economical technical performance, chooses the new technology, the new craft, the choice synergy; establishment job location organization and management measure, construction quality assurance system, safety in production civilized construction management measure and so on. Uses the reasonable plan of construction, scientific progress schedule, builds the good foundation for this project smooth completion.
Keywords: Frame Structure Construction Organization Design